Aug 042012
 

The primary cross line 506 (shown above highlighted in green) in Block EN06 (Eastern time zone, north section, 6th planned block of data) was tentatively scheduled for reflight (606) on August 3, 2012. Maybe tomorrow we’ll have better luck…

August 3, 2012 – 7:18 AM BANGOR, ME
LT Joseph Sweger, Aircraft Commander and Dr. Vicki Childers (foreground) discuss icing conditions along reflight path 606 as LT Mario Singletary and Master Clamper Justin Dahlberg consider scrubbing the first scheduled reflight of one of the cross lines in the GRAV-D Survey, ME12-01, Block ENO6.

August 3, 2012 – 12:32 PM BANGOR, ME
GRAV-D Survey team members from left: Bill Waickman (NGS – surveyor), Joe Sweger (Navy – pilot), Keith Hanson (Navy – mechanic), Vicki Childers (NGS – Section Chief), Justin Dahlberg (NGS – surveyor) and Mario Singletary (Navy – pilot).

 Posted by on August 4, 2012 at 12:12 am